Rekommenderade sökningar
Turnkey project for 380 kV cable system for TenneT TSO - 132 km total length
Client
Total cable route length
Location of the project
Duration
Quantity of order
The future energy supply of the Randstad region was to be secured by new connections.
Thanks to NKT’s flexible solutions we were able to provide a turnkey cable system.
The Randstad380 Zuidring project
Produkter & lösningar
Om NKT
Karriär
Kontakta oss
Anmäla och rapportera
Följ oss
© NKT A/S