Rekommenderade sökningar
The Horns Rev 3 wind farm is located in the North Sea, about 30 km off the western-most point of Denmark, Blåvands Huk, and not far from the city of Esbjerg. The 400 MW (megawatt) wind farm has the capacity to supply electricity to around 400,000 households.
https://www.nkt.se/referenser/horns-rev-3-denmark
NKT was part of the Burbo Bank offshore wind farm extension project. The original Burbo Bank offshore wind farm is situated on the Burbo Flats in Liverpool Bay (UK) and receives the full force of the wind from the Irish Sea in the west, making it an ideal location for offshore wind power generation.
https://www.nkt.se/referenser/burbo-bank-uk
NKT completed turnkey cable system project on record time.
https://www.nkt.se/referenser/guernsey-s-supply-of-green-electricity
The world's longest underground power transmission system.
https://www.nkt.se/referenser/murraylink-australia
NKT supplies transmission links to, from and between wind farms and national energy grids.
https://www.nkt.se/referenser/kriegers-flak
The national power grids between Denmark and Norway are connected through four DC-links crossing the Skagerrak strait, capable to carrying 1700 MW of renewable energy to the two countries’ energy mix. One of the cables, the Skagerrak 2, was damaged due to external impact.
https://www.nkt.se/referenser/skagerrak-2-repair-norway-denmark
30 kV in-field and 150 kV export cables for Germany's first commercial windfarm - 80 km total length
https://www.nkt.se/referenser/baltic-1-germany
Our pioneering HVDC transmission cable system was laid in 1953, between Västervik and Ygne. The link had a rated voltage of 100 kV (kilovolt) and a transmission capacity of 20 MW (megawatt).
https://www.nkt.se/referenser/gotland-sweden
NordBalt is a joint project of the Swedish and Lithuanian TSOs (transmission system operators) Svenska kraftnät and Litgrid AB. It is part of Lithuania’s long-term strategy to secure its energy independence by interconnecting the power grids of the Baltic countries with other grids.
https://www.nkt.se/referenser/nordbalt-the-baltic-sea
The Caithness-Moray project represents a £1.1bn capital investment by SSEN, centred on a submarine cable capable of carrying up to 1,200MW beneath the Moray Firth.
https://www.nkt.se/referenser/cms-scotland
Underground tunnel project for 400 kV cables to optimize enery supply for southern London - 30 km total length
https://www.nkt.se/referenser/beddington-london-united-kingdom
Turnkey project for 380 kV cable system for TenneT TSO - 132 km total length
https://www.nkt.se/referenser/randstad380-netherlands
Produkter & lösningar
Om NKT
Karriär
Kontakta oss
Anmäla och rapportera
© NKT A/S